Home > Buy Now > Other Manufacturing & Processing Machinery > Model DSG-75 High Pressure Pipe Locking Machine
 


BEIJING HONGYUAN MACHINERY  Co., Ltd.
 
icon Products
icon Band Sawing Machine
icon Fire Extinguisher Series
icon Hose Crimping Machine
icon Hydraulic Test Pump

line

icon Company Profile
icon Selling Leads

line

 
Contact us
BEIJING HONGYUAN MACHINERY Co., Ltd.
[China]
Address:
Room 402, NO.2Xingguang Building, Xihongmen Town, Beijing,China Beijing Beijing 100076 China
Phone:
86-010-89111766
Contact name:
liuhuanhuan , Sales Manager
Inquire now










BEIJING HONGYUAN MACHINERY Co., Ltd.



 
Hose Crimping Machine

Model DSG-75 High Pressure Pipe Locking Machine

Inquire now

Model DSG-75 High Pressure Pipe Locking Machine

Click to enlarge image

 Origin China
 Model Number DSG75
 Brand Name HAORI

1. The usage

The machine is an enhanced type of a high pressure locking tube machine in model 75, which is the special equipment for pressing the tube end of a high pressure rubber tube with a outer cover and a core together for the production or repair a hydraulic support.  

2. The composition and the main technical characters

The machine is composed of a locking & pressing mechanism, a motor, a gear pump, a control valve and an oil tank. 

The locking & pressing force            914T

The motor model            Y132M-4

The power                7.5KW

The rotation speed            1440r/min

The gear pump model      CBF-E540-ALPL

The relief valve model              YF-L20H3-S

The reversal valve model              34SM-L20H-W

The oil tank capacity                 100kg

The equipment size(L×W×H)    2000×850×1500

The weight              1200kg

 The work principle and the work procedure

    A locking & pressing mechanism is a work one in the machine. The pressing cover realizes a reciprocation movement under the leading of the ram plunger, which press or slacken the spring presser fixed on the core shaft to push the tube end, the outer cover and the core into the center hole on the spring presser. Then start the motor, the oil pump, the control valve to drive the ram plunger movement. By means of the pressing cover with a taper inner wall, press tightly the outer wale of the spring presser with a same taper to realize the pressing purpose. After change the direction, the pressing cover moves back and the spring presser returns to the original position and you can take the high pressure rubber tube connection end out.  The usage instruction

1. The oil tank should be put a 46# hydraulic oil in trademark Great Wall to 75% of the oil tank height (the oil must be clear, otherwise it will damage the ram and the seal).

2. Before the work, put the increasing handle at a work position and start the motor for three minutes and run for two minutes with empty loads. The tooting seats should be put the lubricating oil.

3. Every oil cup should be put the machinery oil in 20  degree to 30 degree    .

4. Before the machine begins to lock & press the rubber tube, the pressing cover, the position 19th (the leading direction key), the position 13th (the pulley), the position 22nd (the taper face of tooting seat) etc. must be covered by a high class of lubricant(dithio-moly) to reduce the friction. Especially for the high pressure rubber tube over 32mm, it must be put one time for each 20 to 30(do not need too much each time). 

5. When lock & press a high pressure tube with a large flange or a large elbow, if it can not be out into the machine, may move the increasing handle to the work position. After the tube is put in, you can lock & press it. After the lock & press, move the handle to the emergency stop position and put another end into the work position and move the handle to work position for locking & pressing and repeat this procedure. For a common high pressure rubber tube, the increasing handle can be put on the work position and do not need to move.

6. After work, the tooting and the pressing cover should be cleaned up and put the lubricating oil on and the tooting seat and the pressing cover can not be too near (that the pressing cover and the tooting seat do not touch is the standard). At last, stop the machine and loose the increasing handle and put it on the emergency stop position to make the inner spring loose.

7. It must be noted that before the start, the increasing handle must be on the work position, otherwise the start movement will damage the machine header to stop work.

The installation and the use

1. The machine should be installed on the level foundation of the workshop.

2. The installation and the adjustment& test are the manufacturer to run the machine with an empty load and carry out a pressing & connection test with the tube connection end. After have been confirmed that it meets the design requirement, it can be allowed to leave the factory.

3. For locking & pressing the different specification of the rubber tube, it should be changed to the different specification of the pressing header.

4. After a long period of the use, if a leakage oil phenomenon is found, it is necessary to change the seal parts in the ram and the pipe& valve system on time. 

5. The hydraulic oil should use 46# resisting wear one in trademark Great Wall  and the oil temperature  should be controlled in 30-50

6. For the pressing mechanism work condition, it is necessary to carry out a fixed period of maintenance to assure the equipment in a normal running.

 

 




Inquire now